Shopping Center IKEA

Užduotis: Installation of the process management system during integration and combination of installed engineering systems into a common building management system (BMS)

In the capital of Lithuania, IKEA, the first Scandinavian shopping centre in the Baltic countries with more than 26,500 m2 in area, was opened. UAB ELTALIS and Ko performed
process management and automation part for the project preparation and installation. Within a short period of time, ventilation, heating and solar system automation, smoke
ventilation automation, indoor and outdoor lighting, heating, electricity and water meter data reading system installation works were carried out by combining other contractors’ installed
engineering systems into a single building management system (BMS).


< Atgal į Projektai